JAWA BARAT, KOTA BOGOR - (2022)
Mohon Tunggu ...
GSRW TOL BANGKINANG
RIAU, KABUPATEN KAMPAR
2023
This GSRW is intended as an abutment for a toll road flyover bridge. The volume of work at this location is 200 m2 with a length of up to 13 meters. The challenge of this project is that the abutment is located at the top of a ravine and has a very limited ROW, with wing walls that have been made previously, requiring detailed geotechnical calculations, modeling and construction implementation that are extra careful.